Take a look at what we’ve been up to!

Looking back at the last few weeks we have been extremely busy. Our techs have been doing such a great job of juggling all of our big projects and meeting their deadlines while also handling our smaller jobs such as service calls or smaller cabling jobs. 

Pictured: A completed CAT6 2 port drop.

Pictured: A completed Access Point (AP) 

Our techs traveled a few hours away  for our friends over and CMF and installed (2)  CAT6 CMR cables to 3 locations and installed (1)  CAT6 CMR cables to (3) AP ceiling locations then proceeded to terminate and test all the lines. Finally they placed the proper labels on everything. 

Soon after our techs took a quick trip down to Firebaugh, CA to to do some work for CMFS. They installed (1) CAT6 CMR cable and installed an Access Point to the rear building. Our techs also relocated an existing Access Point from the main point of entry (MPOE) to outside of the MPOE. As they followed the proper procedure to terminate, test and label everything once the installation was done.

 

 

 

We have also recently done some work for our partners over at Peach Tree for a new location. The techs installed 4 CAT6 CMR cables to a single location in their office. They also mounted plywood to make the mounting of a 4U Rack more accessible. On the outside of the building they installed a 25′ metal wire cover for exposed cabling that ran down the side of the building.

Pictured to the right: The completed wire covering. 

We hope you enjoyed our mini-update as I could not include every job we’ve done however we do our best to keep it interesting.

Thank you for reading, keep an eye out for our next blog!!!