Vesta Housing DBA Aro Homes

Take a look at one of our most recent projects…

Aro Homes has reimagined the way homes are built. Their goal is to build, create and innovate a new way to build the home you desire. They have changed the housing games as their homes are engineered to be as sustainable as possible, using less water and energy. 

Pictured : Our techs had started mounting a standard tilt mount and right under it is a HDMI port with a faceplate.

Pictured : A fully mounted TV 

Here at Vesta Housing our team sure did quite a bit of work. We installed 2 CAT6 CMR cables to 18 locations, 1 CAT6 CMR cables to 22 locations, and installed 18 access points. Our techs also installed and terminated up to 500 feet of armored 12-strand multimode fiber along with mounting plywood and a 18u enclosure inside their warehouse. In the office, we also mounted 3 TV’s on tilt mounts, installed a 50 foot HDMI inside the conference room, installed a 35 ft and 10 ft HDMI with faceplates to other TV’s along with a 2-post rack and 5 feet of a cable tray. We finished up by terminating, testing and labeling everything.

Pictured: Our Foreman Jeremy mounting the 18U enclosure using a rented lift from H & E.

Pictured: CAT6 CMR cable (white) and Fiber Optics cable (aqua) in the middle of the cable pulling process. 

Our team completed this project in a little under a week and made sure our friends at Aro Homes were happy with the finished product.

None the less, we continue to work towards our goal to grow as a company and keep ourselves busy.

 Keep an eye out for our next blog to see what big projects we’re up to next. 

Thank you for reading and considering us for your low voltage needs!!